Construction - Ongoing Projects

Museum of Modern Sarawak (MMS)

Naim has collaborated with the reputable PADI Gallery and Design, Singapore, a museum design specialist to build the state-of-the-art ‘Museum of Modern Sarawak’ (Muzium Moden Sarawak or MMS). No stranger to museum design in the region, PADI was involved in numerous projects such as Maritime Museum, Singapore and Muzeum Adat (Negeri Sembilan), Muzeum Tekstile (KL), ...

Find Out More

Mass Rapid Transit (MRT)

Naim was awarded two stations packages under the multi-billion Klang Valley Mass Rapid Transit (KVMRT) project, namely Stations Package S4 which includes Section 16, Pusat Bandar Damansara and Semantan, as well as Stations Package S2 which includes Bandar Industri Sg Buloh, PJU 5 and Dataran Sunway. Naim was the first East Malaysian Contractor to be ...

Find Out More

Kings Road from Waito to Wailotua, Fiji

Naim successfully bidded and was awarded this project on 31st August 2009, which involved the upgrading of Kings Road from Waito to Wailotua, Fiji. This upgrading has brought an important stretch of Pan Fiji’s National Road to international highway standards of road quality and safety, reducing the travelling time by 30 minutes. It is noteworthy that: Naim ...

Find Out More

Bengoh Resettlement Scheme Infrastructure and Associated Works (Phase 1), Bengoh, Sarawak

This contract, which was awarded by the Housing Development Corporation involved the designing and building of the Bengoh Resettlement Scheme, comprising of 204 units of resettlement housing lots on RGC area and government reserve, roads for internal areas and gravel roads for agricultural area, water supply system and electrical services. The project is scheduled to complete in 2nd quarter of 2013.

Find Out More

Terbat/Pankalan Amo/Tebedu Road, Samarahan, Sarawak

The Terbat/Pankalan Amo/Tebedu Road Project at the Samarahan Division comprises two sections: Section A – 7 kms from Kampung Terbat to Kampung Tragu Section B – 1.4 kms from Kampung Tragu to Kampung Mapu Kijabu Upon completion of these access roads, residents of these villages are able to upgrade their standard of living by transporting their products or ...

Find Out More

Flood Mitigation Works, Kuching

We are awaiting the go-ahead from the Federal Government to continue work. Our revised design takes a holistic approach to floodwater management, with an 8km long, 250m wide bypass channel capable of dealing with catastrophic, once-in-a-century flood events with a peak flow as high as 4,000m3/sec. As well as the bypass channel, the project will ...

Find Out More