Construction - Completed Projects

Kemena Bridge, Bintulu, Sarawak

Part of the aforementioned Sibu-Bintulu road package, this 456-metre bridge was only the second in Malaysia to be built using the Incremental Launching Method (ILM), whereby the bridge was actually built on lang and launched out in 20-metre stages. This process was not only one of the most dramatic and imposing sights in the entire ...

Find Out More

State Legislative Assembly [Dewan Undangan Negeri (DUN)] Complex, Kuching, Sarawak

Naim and PPES Works were the turnkey contractors for this project. The complex, completed in May 2009, boasts the state-of-the-art facilities and beautifully landscaped gardens and stands as a testament of solid and unique architecture. The complex has a gross floor area of 40,739m2 with a nine-storey high roof apex.

Find Out More

Sarawak Medical Science College, Padawan, Sarawak

This project, which was sited on a 30-acre land at Mile 13th, Penrissen Road whichc was approximately 20kms south of Kuching city and 4kms from Kota Padawan, was a joint venture between Naim and Konsortium Javel Engineering for Ministry of Health, Malaysia. It was built to replace the existing para medical personnel school in Kuching, ...

Find Out More

Miri Go-Kart Racing Track, Sarawak

The Miri Go-Kart Track was handed over officially to Ministry of Infrastructure Development and Communication on 23rd April 2004. It was the first of its kind in Sarawak and complied with the International Standard for a motor sport facility. It was located on an 18.5-acres site, comprising a 1.3km long track which could also be ...

Find Out More

Pujut/Tudan/Kuala Baram Link Road (Phase 2), Miri, Sarawak

This project was on a design and built basis for the Sarawak Government. The length of the link road was 4.5kms from Tudan to Kuala Baram, and was completed 6 months ahead of schedule.

Find Out More

University College of Technology Sarawak (UCTS)(Phase 2, Stage 1) Project, Sibu, Sarawak:

A joint-venture between Naim Engineering Sdn Bhd and Hock Peng Furniture and General Contractor Sdn Bhd, this project was adjudged the winner of the QLASSIC Excellence Awards 2016 in the Non-Residential (Large) category recently. In addition, the project also received the High QLASSIC Achievement accolade for the highest score achieved for any project in the ...

Find Out More

Laying of Water Pipelines for Rural Areas in Sarawak

This project consisted of the laying of water pipes for rural areas in Sarawak. This project was completed two months ahead of schedule.

Find Out More

Pujut/Tudan/Kuala Baram Link Road, Miri (Phase 3), Sarawak

This project was on a design and built basis for the Sarawak Government. It involved the design and construction of 8.5km Tudan-Baram Link Road, Miri, and was completed 3 months ahead of schedule.

Find Out More

Sibu-Bintulu Roads Phase 1 and 2 (from Kemena Industrial Estate to New Bintulu Airport) and Kemena Bridge, Sarawak

The project was for upgrading and improvement of the existing Sibu-Bintulu Road, from the Kemena Industrial Estate to the junction with the access road leading to the new Bintulu Airport and including a parallel bridge of 456m span over the Batang Kemena. The Kemena Bridge is the second bridge over Batang Kemena and the first ...

Find Out More