Construction - Completed Projects

Institut Latihan Perindustrian (ILP) Phase 1 & 2, Miri, Sarawak

This vocational training institute for school leavers was built for Ministry of Human Resources. Built on a 60-acre site in Bandar Baru Permyjaya township, the project was a turnkey project supervised by a Project Management Consultant (PMC). The institute, once completed, would be able to accommodate up to 600 students over 6 faculties and is ...

Find Out More

Institut Kemahiran Belia Negara (IKBN), Miri, Sarawak

It was one of the training skills institutes implemented by the Ministry of Youth and Sports Malaysia for school leavers. Located at Permyjaya New Township and sitting on a 51-acre plot, it was able to cater for at least 900 students by providing skills training in three major streams namely Hospitality Services, Mechanical Engineering ...

Find Out More

Flood Mitigations Works, Kuching (Phase 1), Sarawak

The Department of Irrigation and Drainage commissioned the contract for the construction of the first two kilometers of the Flood Bypass Channel at the downstream end of the Sarawak River. The turnkey contractor for the project was a joint venture between Naim Cendera Sdn Bhd and Ambang Project Management Sdn Bhd. Phase 1 Stage 1 included ...

Find Out More

Islamic Complex (Kompleks Islam Sarawak), Kuching, Sarawak

This project was on a design and built basis for Majlis Islam Sarawak and comprised a multi-purpose hall and 17-storey office block. The multi-purpose hall was capable of accommodating up to 2,000 people., while the tower block had 2 levels for basement, shopping and dining, level 4 and 5 for library, and level 6 and ...

Find Out More

Senari Industrial Complex for Oil and Gas Jetty, Tanjung Manis, Sarawak

This contract involved the construction of the Senari Industrial Complex Jetty for Oil and Gas. Located in Tanjung Manis, Sarawak, the contract was awarded to Naim by Tanjung Manis OGC Port Sdn Bhd in 2010. The project was part of the Central Oil Distribution Terminal (CODT) which would distribute oil from Petronas and Shell to ...

Find Out More

Access Road from Kuala Baram Highway to Curtin University, Sarawak

This involved the design and construction of an access road to Curtin University of Technology Sarawak, Miri for Public Works Department. The project was completed one and half months ahead on schedule, on 23rd December 2004.

Find Out More

Access Road to Mukah from Sibu/Bintulu Junction to Matadeng Junction, Mukah, Sarawak

The project aimed to provide a fast and direct accessibility to Mukah from Sibu/Bintulu Junction to Matadeng Junction, Mukah. The road upgrading works consisted of extensive straightening and flattering of the existing road, and also involved the laying of a main water pipeline along the length of the road. The project has since been completed.

Find Out More

Balingian/Kuala Balingian/Kuala Tatau/Bintulu Road (Phase 1), Sibu, Sarawak

This project comprised a part of the coastal highway and was the only link between Balingian and Kuala Balingian. The project was completed on schedule.

Find Out More

Bengoh Dam, Bengoh, Sarawak

This 63 metre high by 267 metre long dam will have a capacity of 144 million cubic metres (1m³ = 1,000kg or 1 tonne) and will produce a lake with a surface area of approximately 10km². Designed to secure Kuching’s water supply for the foreseeable future, the dam was only the second in Malaysia to ...

Find Out More