In order to avoid speculation and present a realistic order valuation to shareholders, we have chosen to confine our descriptions of future projects to those for which we have already received Letter of Award (LOA). Any other projects for which we are currently bidding will be only be announced once they are provisionally awarded.

Project Listing

BENGOH DAM RESETTLEMENT SCHEME

  On 27th October 2010 we were awarded the contract to construct the infrastructure for the Bengoh Resettlement Scheme by Jabatan Kerja Raya Sarawak. This project comprises a mini-township with full urban amenities and infrastructure to provide comfortable permanent homes for the people resettled under the Bengoh Dam project, for which we were also the main contractor. The 324 acre site will accommodate the four kampungs (villages) and provide homes for more than 200 families. A further 704 acres of agriculture land will be prepared for allocation to the resettled families. The scope ...
 
FLOOD MITIGATION WORKS, KUCHING

  stage, and we are awaiting the go-ahead from the Federal Government to continue work. Our revised design takes a holistic approach to floodwater management, with an 8km long, 250m wide bypass channel capable of dealing with catastrophic, once-in-a-century flood events with a peak flow as high as 4,000m3/sec. As well as the bypass channel, the project will also include water retention ponds, bundings, telemetry equipment, sluice gates and other associated works. Construction is expected to take between 60 and 72 months.
 


 
 

 

 

 

 
edge edge edge
association  
© 2012 Naim Holdings Berhad. All Rights Reserved.
You are visitor no.: 2665