Future Projects
In order to avoid speculation and present a realistic order valuation to shareholders, we have chosen to confine our descriptions of future projects to those for which we have already received Letter of Award (LOA). Any other projects for which we are currently bidding will be only be announced once they are provisionally awarded.
Project Listing
BENGOH DAM RESETTLEMENT SCHEME |
|
|
|
On 27th October 2010 we were awarded the contract to construct the
infrastructure for the Bengoh Resettlement Scheme by Jabatan Kerja
Raya Sarawak. This project comprises a mini-township with full urban
amenities and infrastructure to provide comfortable permanent homes
for the people resettled under the Bengoh Dam project, for which we
were also the main contractor. The 324 acre site will accommodate the
four kampungs (villages) and provide homes for more than 200 families.
A further 704 acres of agriculture land will be prepared for allocation
to the resettled families. The scope ... |
| |
|
|
FLOOD MITIGATION WORKS, KUCHING |
|
|
|
stage, and we are awaiting the go-ahead from the Federal Government to
continue work. Our revised design takes a holistic approach to floodwater
management, with an 8km long, 250m wide bypass channel capable of
dealing with catastrophic, once-in-a-century flood events with a peak
flow as high as 4,000m3/sec. As well as the bypass channel, the project
will also include water retention ponds, bundings, telemetry equipment,
sluice gates and other associated works. Construction is expected to take
between 60 and 72 months. |
| |
|
|
|
|
|