Pujut/Tudan/Kuala Baram Link Road (Phase 2), Miri, Sarawak

Pujut/Tudan/Kuala Baram Link Road (Phase 2), Miri, Sarawak

Roads and Highways
Completed Projects

This project was on a design and built basis for the Sarawak Government. The length of the link road was 4.5kms from Tudan to Kuala Baram, and was completed 6 months ahead of schedule.