Laying of Water Pipelines for Rural Areas in Sarawak

This project consisted of the laying of water pipes for rural areas in Sarawak. This project was completed two months ahead of schedule.

Find Out More

Pujut/Tudan/Kuala Baram Link Road, Miri (Phase 3), Sarawak

This project was on a design and built basis for the Sarawak Government. It involved the design and construction of 8.5km Tudan-Baram Link Road, Miri, and was completed 3 months ahead of schedule.

Find Out More

Sibu-Bintulu Roads Phase 1 and 2 (from Kemena Industrial Estate to New Bintulu Airport) and Kemena Bridge, Sarawak

The project was for upgrading and improvement of the existing Sibu-Bintulu Road, from the Kemena Industrial Estate to the junction with the access road leading to the new Bintulu Airport and including a parallel bridge of 456m span over the Batang Kemena. The Kemena Bridge is the second bridge over Batang Kemena and the first ...

Find Out More

Sibu-Matadeng Road, Mukah, Sarawak

Providing fast and direct access to one of Sarawak's fastest growing regions, this road will help to release the economic potential of Sarawak's coastal heartland. As well as extensive straightening and flattering of the existing road to provide a safe and pleasant driving experience, the project also involved the laying of a main water pipeline ...

Find Out More

Bengoh Resettlement Scheme Infrastructure and Associated Works (Phase 1), Bengoh, Sarawak

This contract, which was awarded by the Housing Development Corporation involved the designing and building of the Bengoh Resettlement Scheme, comprising of 204 units of resettlement housing lots on RGC area and government reserve, roads for internal areas and gravel roads for agricultural area, water supply system and electrical services. The project is scheduled to complete in 2nd quarter of 2013.

Find Out More

Terbat/Pankalan Amo/Tebedu Road, Samarahan, Sarawak

The Terbat/Pankalan Amo/Tebedu Road Project at the Samarahan Division comprises two sections: Section A – 7 kms from Kampung Terbat to Kampung Tragu Section B – 1.4 kms from Kampung Tragu to Kampung Mapu Kijabu Upon completion of these access roads, residents of these villages are able to upgrade their standard of living by transporting their products or ...

Find Out More

275KV Bakun-Samalaju Transmission Line (Package B)

Naim undertook a significant part (Package B Part I and II) of the 275KV Overhead Transmission Line from the 3,600 MW Bakun Hydroelectric Project to the Samalaju Industrial Zone, near Bintulu. The experience gained by working with Sinohydro Corporation of China will stand us in good stead when we bid for other similar projects, both ...

Find Out More

Bengoh Dam Resettlement Scheme

On 27th October 2010 we were awarded the contract to construct the infrastructure for the Bengoh Resettlement Scheme by Jabatan Kerja Raya Sarawak. This project comprises a mini-township with full urban amenities and infrastructure to provide comfortable permanent homes for the people resettled under the Bengoh Dam project, for which we were also the main ...

Find Out More

Flood Mitigation Works, Kuching

We are awaiting the go-ahead from the Federal Government to continue work. Our revised design takes a holistic approach to floodwater management, with an 8km long, 250m wide bypass channel capable of dealing with catastrophic, once-in-a-century flood events with a peak flow as high as 4,000m3/sec. As well as the bypass channel, the project will ...

Find Out More