Balingian/Kuala Balingian/Kuala Tatau/Bintulu Road (Phase 1), Sibu, Sarawak

This project comprised a part of the coastal highway and was the only link between Balingian and Kuala Balingian. The project was completed on schedule.

Find Out More

Bengoh Dam, Bengoh, Sarawak

This 63 metre high by 267 metre long dam will have a capacity of 144 million cubic metres (1m³ = 1,000kg or 1 tonne) and will produce a lake with a surface area of approximately 10km². Designed to secure Kuching’s water supply for the foreseeable future, the dam was only the second in Malaysia to ...

Find Out More

Balingian/Kuala Balingian/Kuala Tatau/Bintulu Road, Sibu (Phase 2), Sarawak

This was the link road connecting Kuala Balingian/ Balingian Road to the Balingian Bridge. It was completed eight months ahead of schedule.

Find Out More

Kampung Semadang-Bau Road, Bau, Padawan, Sarawak

This project for the Public Works Department comprised the construction of a 12.4km access road into the mountainous hinterlands between Poak Road near Kpg Serapok to Kpg Puruh Semadang/ Kpg Puruh Garung in the Padawan District, Kuching, as well as concrete bridges over Sg. Krokong, Sg. Raden and Sg. Sarawak Kiri. Upon completion, the road ...

Find Out More

Kings Road from Waito to Wailotua, Fiji

Naim successfully bidded and was awarded this project on 31st August 2009, which involved the upgrading of Kings Road from Waito to Wailotua, Fiji. This upgrading has brought an important stretch of Pan Fiji’s National Road to international highway standards of road quality and safety, reducing the travelling time by 30 minutes. It is noteworthy that: Naim ...

Find Out More

Kuching/Sibu Road (from Julau Junction to Sibu Airport Junction), Sarawak

This road upgrading works consisted of 2 sections - Section A , from Sibu Airport junction to Durin Bridge, which was approximately 11.9 km and Section B, from Durin Bridge to the Julau road junction, which was approximately 17.4 km. The works included the construction of drainage works, R.C Bridge, detour roads and bridges, traffic ...

Find Out More

Pujut/Tudan/Kuala Baram Link Road and Bridge over Sungai Miri (Phase 1), Miri, Sarawak

This project, which comprised a 1.5kms Tudan-Kuala Baram Link Road and bridge over Sungai Miri was on a design and built basis for Sarawak Government. The project was successfully completed three months ahead of schedule.

Find Out More

SRK and SMK Merbau, Miri

This project which combined 2 schools in one compound, won the coveted CIDB Malaysia Construction Industry Excellence Award for 2003. Besides receiving numerous plaudits for the quality of the design for both schools, the project was also completed ahead of schedule in 2003.

Find Out More

Maktab Rendah Sains Mara (MRSM), Mukah, Sarawak

Construction of MRSM, Mukah Division Sarawak was completed on 28 April 2009. This project covered an area of approximately 19.2ha and was adjacent to the SMK Mukah and about 2.3kms from Mukah town. The MRSM comprised an administration building, lecture hall, quarters, hostel, laboratories, sport complex, soccer and hockey field, tennis courts, running track and ...

Find Out More