Kemena Bridge, Bintulu, Sarawak

Kemena Bridge, Bintulu, Sarawak

Bridges
Completed Projects

Part of the aforementioned Sibu-Bintulu road package, this 456-metre bridge was only the second in Malaysia to be built using the Incremental Launching Method (ILM), whereby the bridge was actually built on lang and launched out in 20-metre stages. This process was not only one of the most dramatic and imposing sights in the entire construction industry – it also required equally considerable expertise in this innovative technology, which was widely used in Europe.