Completed Projects

Projects completed during 2008 had a combined value of RM 1.05 billion and in the best Naim tradition; all were completed on time or ahead of schedule.

Project Listing

PUJUT/ TUDAN/ KUALA BARAM LINK ROAD AND BRIDGE OVER SUNGAI MIRI, MIRI (PHASE 1)

  This project is on a design and built basis for Sarawak Government with a contract value RM14 million. It consists of a 1.5km Tudan – Kuala Baram Link Road and bridge over Sungai Miri and was successfully completed three months ahead of schedule.
 
PUJUT/TUDAN/KUALA BARAM LINK ROAD, MIRI (PHASE 2)

  Investigation, design, construction and completion of the Pujut/ Tudan/ Kuala Baram Link Road, Miri Phase 2 is on a design and built basis for Sarawak Government with a contract value RM14 million. This project to design and built the 4.5km Tudan – Kuala Baram Link Road, Miri, was completed six months ahead of schedule.
 
PUJUT/TUDAN/KUALA BARAM LINK ROAD, MIRI (PHASE 3)

  Investigation, design, construction and completion of the Pujut/ Tudan/ Kuala Baram Link Road, Miri Phase 3 is on a design and built basis for Sarawak Government with a contract value RM39 million. This project to design and built the 8.5km Tudan – Kuala Baram Link Road, Miri, was completed three months ahead of schedule.
 