Completed Projects
Projects completed during 2008 had a combined value of RM 1.05 billion and in the best Naim tradition; all were completed on time or ahead of schedule.
Project Listing
SIBU – BINTULU ROADS PHASE 1 AND 2 (FROM KEMENA INDUSTRIAL TO NEW BINTULU AIRPORT) AND KEMENA BRIDGE |
|
|
|
The project is for upgrading and improvement of the existing Sibu – Bintulu Road commencing from the Kemena Industrial Estate up to the junction with the access road leading to the new Airport, including a parallel bridge of 456m span over the Batang Kemena. The Kemena Bridge is the second bridge over Batang Kemena and the first in Sarawak to use the Incremental Launching Method (ILM). The roads and bridge works of these projects were successfully completed ahead of schedule.
|
| |
|
|
MIRI GO-KART RACING TRACK |
|
|
|
The Miri Go-Kart Track was handed over officially to Ministry of Infrastructure Development & Communication on 23rd April 2004. It is the first of its kind in Sarawak and complies with the International Standard for a motor sport facility. It is located on an 18.5-acres site, comprising a 1.3km long track which can also be configured into an 800m and a 500m track for the various classes of racing. Winner of the Malaysian Construction Industry Excellence (MCIE) Award for Medium Scale Engineering Project 2004 by Construction Industry Development Board (CIDB) Malaysia.
|
| |
|
|
INSTITUT KEMAHIRAN BELIA NEGARA (IKBN), MIRI |
|
|
|
It is one of a training skills institute that was implemented by Ministry of Youth & Sports Malaysia for school leavers. This institute is located at Permyjaya New Township sitting on a 51-acre plot and it’s able to cater for at least 900 students by providing skills training in three major streams namely Hospitality Services, Mechanical Engineering and Automotive Repairs. It was completed on schedule and won us The CIDB Malaysia Construction Industry Award for the category “Institutional Building Project Builders Award 2002.
|
| |
|
|
|
|
|